Stoner Boatworks is building glass ones.
Reply With Quote
  #52  
Old 12-31-2018, 10:20 AM
Kraken Kraken is offline
Recovered
 
Join Date: Aug 2017
Posts: 113
Default

A lot of work has been done. It’s hard to balance work family and boat. It will be better when I can combine family and boat for a few fun keys trips. Maybe swordfish?

I finished installing the tanks and fuel lines. The deck is bonded down! We used Arjay vinylester bonding compound. A good bead around the lip of the old deck and a 6” wide glob down the middle of each stringer. I had a friend help. He went down the port side, starting at the bow. I did the starboard side. The 5 gallons of Arjay bonding compound was split into two buckets and mixed with a drill. We only used 4 gallons. The rest was wasted. The deck is rock solid. Need to add tabbing but waiting to finish the transom and do it all at once.
Attached Images
  
Reply With Quote
  #53  
Old 12-31-2018, 11:27 AM
DonV DonV is offline
Senior Member
 
Join Date: Jul 2004
Location: Apollo Beach or Islamorada
Posts: 3,488
Send a message via ICQ to DonV
Default

Good move on the Arjay! Nothing to worry about as far as anything coming apart!!
Reply With Quote
  #54  
Old 01-01-2019, 09:38 AM
Kraken Kraken is offline
Recovered
 
Join Date: Aug 2017
Posts: 113
Default

Now starting on the transom cap. I want to have a 40 gallon live well in the middle and two hatches that hold 5 gallon buckets on the sides. There is a 2 1/2” curve to the top.

I started by making a template of the cap out of foam. I’m going to try to do this in one piece out of a mold. I used 2x8’s and melonine to create the curve. The scrap melonine was used to create the sides and slight curve in the rear wall. Modeling clay a made the radius in the corners. I ran a small socket across them to get them smooth. The live well and hatch forms are mdf that has been sprayed with duratec primer and sanded. Here is a pic of the partial assembly.

My plan is to paint in two layers of gelcoat and layin two layers of 1 1/2 oz mat then two layers of 1708. I’ll add scrap cossa as reinforcements then one more layer of 1708.

I’ll mold up the live well also the same way then glass it in. I hope everything fits. I measured three times.
Attached Images
  
Reply With Quote
  #55  
Old 01-02-2019, 09:21 AM
castnetcracker castnetcracker is offline
Recovered
 
Join Date: Mar 2018
Posts: 68
Default

the layup schedule for your stern cap will be rock solid. I did the same but with Divinycel H80 and it was plenty.
Reply With Quote
  #56  
Old 01-06-2019, 12:29 AM
Kraken Kraken is offline
Recovered
 
Join Date: Aug 2017
Posts: 113
Default

I laid up two hatches as a learning process before tackling the big job. The layup is rock solid and the hatches fit great.

Today my son helped with the transom cap layup. We started spraying partall mold release. Then painted two coats of gelcoat. With all the small cavities the layup was hard. Hope we got all the air out. Two layers of csm and two of 1708. Took all day. Glad I had help. Also took 3 gallons of vinylester resin.

Tomorrow we will add the final layer of 1708 over the cossa reinforced. Then we can pop it and see how we did.
Attached Images
 
Reply With Quote
  #57  
Old 01-08-2019, 09:03 AM
Kraken Kraken is offline
Recovered
 
Join Date: Aug 2017
Posts: 113
Default

I popped the transom cap. It released from most of the mold but got hung up on the bucket plugs. I had to destroy them. There are a few blemishes that will need fixing. I did the entire layup as a continuous wet layup. I think that adding the 1708 over the wet csm caused the issue. If I were to do it again, I’d let the csm kick before adding additional layers. Overall not a bad part and should save me time.
Attached Images
    
Reply With Quote
  #58  
Old 01-08-2019, 02:19 PM
SnafuFishTeam SnafuFishTeam is offline
Senior Member
 
Join Date: Jun 2009
Posts: 211
Default

Just a heads up. Armstrong is very busy and about three month lead time for a new bracket. Ordered mine in December. Pricing went up as well. Cost now is $5k.
Reply With Quote
  #59  
Old 01-08-2019, 03:30 PM
KNZ911 KNZ911 is offline
Recovered
 
Join Date: Jul 2018
Posts: 100
Default

Stoner bracket is approx. 3500 with a 3 week build time. Talked with Josh about building one last month. Plus his platform is higher allowing for placement of tabs on outside chine.
Reply With Quote
  #60  
Old 01-08-2019, 03:39 PM
Enyar Enyar is offline
Recovered
 
Join Date: Aug 2018
Posts: 33
Default

Do those moeller tanks have baffles?
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:21 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft