#21
|
|||
|
|||
Fuel Tank and Rigging Tube
Went with 87 gallon fuel tank. Plan is to run a Evinrude G2 250HO. Should have plenty of range with out all the extra weight of fuel.
|
#22
|
|||
|
|||
Fuel Tank and fish Box
Fishbox is 24 wide by 48 long and about 15 deep. Hope to fill it up soon!
|
#23
|
|||
|
|||
Rear Dry Storage behind Fuel Tank
This is 36 long by 24 wide and about 16 deep. Possibly will put in fresh water tank in part of compartment and then who knows what else I will keep down there.
|
#24
|
|||
|
|||
Front V Area Storage Futured In
We still have not opened this up yet but it will be a perfect storage area. Still deciding how to do dry hatch. More to come.
|
#25
|
|||
|
|||
Floors Finally Installed Lots of Coosa
Awesome to have 3/4" Coosa Board on the floor now. Coosa was bedded to stringers with Arjay bedding compound.
|
#26
|
|||
|
|||
Fairing Going on Floor and Sides
Arjay fairing compound going down. Sorry for the sideways pictures. I have straightened them our on my end but every time I attach they rotate left or right. Tilt head if needed!
|
#27
|
|||
|
|||
Top Cap has been Recored with 3/4 Divynacel
Gelcoat going on top cap
|
#28
|
|||
|
|||
Gelcoat on Top Cap
Staring to really look good
|
#29
|
|||
|
|||
Another Look at the Top Cap
At least 4 passes of gel coat should last a while
|
#30
|
|||
|
|||
Hatches Cut and Floors Gel Coated
Love the Hatches JV installed. They are out of a Mold from Andros.
|
|
|